The drive trips on undervoltage (F30003) under load; noticeable ripple observed on the DC-link voltage.

Duration: 2-3 business daysUpdated: 2026-07-07
Before

Faulty — board out of service

After

Repaired — tested under load

Fault

The drive trips on undervoltage (F30003) under load; noticeable ripple observed on the DC-link voltage.

Analysis

Mains and input phases were healthy. DC-link ripple and bus collapse under load pointed to aged electrolytic capacitors. ESR measurement showed high internal resistance.

Repair Steps

  1. 1
    Mains/input verification

    Input phases and rectifier found healthy.

  2. 2
    Capacitor measurement

    DC-link capacitors measured with ESR meter; high ESR found.

  3. 3
    Recap

    Capacitors replaced with new ones of the original value/rating.

  4. 4
    Test under load

    DC-link ripple returned to normal; F30003 did not recur.

Changed Components

  • DC-link electrolytic capacitors
  • Balancing resistors

Test Result

DC link stable under load; ripple within manufacturer tolerance.

This is an illustrative repair flow that shows the process; no real customer/board information is shared.

Related Faults

Related Topics

Related Repair Cases

Related Products

Facing the same issue?

Send your faulty board to our lab or consult our expert team. Free pre-analysis.

+90 543 855 16 44 · info@elkarotomasyon.com